WASTEWATER

Services

  • • Infiltration / Inflow Studies
  • • Planning and Needs Assessments
  • • Sanitary Sewage Pumping Facilities
  • • Sanitary Sewer Expansion
  • • Sanitary Sewer Rehabilitation
  • • Sanitary Sewer System Hydraulic Analysis

Current Work

A

Wastewater Collection Improvements

Wagner, SD
Replacement of 2,700 lineal feet of 8-inch sanitary sewer main; 8 manholes and 42 service lines.
B

Wastewater Collection Improvements

Mitchell, SD
Construction of 2,765 lineal feet of 12-inch sanitary sewer main from the main interceptor to the Mitchell Technical Institute Campus and an area of approximately 560 acres of future development southeast of the city.
C

Wastewater Treatment Improvements

Elkton, SD
Modification of the existing wastewater treatment facility from a three-cell system to a 5.69-acre primary cell and a 1.76-acre secondary cell; the addition of a 900-gallon per minute transfer pump, a 3.19-acre and two 2.84-acre wetland treatment cells.

Previous Work

  • • Foster Street Lift Station Rehabilitation (Mitchell, South Dakota)
  • • Southeast Sanitary Sewer Interceptor (Mitchell, South Dakota)
  • • Wastewater System Improvements (Kimball, South Dakota)
  • • Wastewater Treatment Improvements (Castlewood, South Dakota)
  • • Wastewater Treatment Plant Improvements (Mitchell, South Dakota)
  • • Wastewater Treatment and Collection System Improvements (Corsica, South Dakota)